Fort Collins, CO

Woodward, Inc.

Dynalectric Colorado installed medium voltage power distribution, site utilities, lighting and life safety systems.

Interior view of  Woodward, Inc.'s new manufacturing plant.

Value Delivered

Dynalectric Company (Colorado) was a design-assist electrical contractor for the construction of Woodward, Inc.’s new manufacturing campus. The project included 270,000 square feet of manufacturing space, as well as 70,000 square feet of office space, administration, collaborative space, secure entrance lobbies, a café, and kitchen facilities.

We were involved with the project from preconstruction through build completion. Construction began eight months into the design phase—well before design finalization.

Client Objectives

Woodward, Inc. sought to build a new manufacturing plant to support its Industrial Turbomachinery Systems division.

Solutions

Dynalectric Colorado’s scope of work included:

  • Interior and exterior lighting
  • Site utilities
  • New power distribution
  • Life safety systems
  • Access control and closed-circuit television security cameras
  • Structured cabling for voice and data

Client Background

Woodward, Inc. is a designer, manufacturer, and service provider of control systems and components for aircraft engines, industrial engines and turbines, power generation, and mobile industrial equipment.